1,400-Tonne Bridge Moved Without Cranes in Austria
Engineers in Innsbruck have relocated a massive 1,400-tonne bridge 100 metres using hydraulic presses and heavy-duty platforms, avoiding cranes for safety and precision in the urban area.
Engineers in Innsbruck have relocated a massive 1,400-tonne bridge 100 metres using hydraulic presses and heavy-duty platforms, avoiding cranes for safety and precision in the urban area.
Austrian railway operator ÖBB has successfully relocated a massive 1,400-tonne bridge 100 metres in Innsbruck using hydraulic presses and heavy-duty platforms instead of cranes.