Stalybridge's Grade-II listed Astley Cheetham Art Gallery renovation approved
Astley Cheetham Art Gallery renovation approved in Stalybridge

The renovation of the Grade-II listed library in the heart of Stalybridge has been given the go-ahead.

Astley Cheetham Art Gallery will be spruced up inside, with the library and art gallery areas, a new wall getting an overhaul, as well as the floor and ceiling finishes. The approved scheme also includes plans for a new accessible toilet and to install a new platform lift from the basement to the first floor.

Part of wider regeneration

Around £1.8m is being spent on the Jacobean Revival style building as part of the wider improvement scheme to regenerate Stalybridge’s cultural quarter and historical assets.

The Civic Hall, just next door, has already received a renovation, which was completed last year. The council already gained planning permission to demolish the old rear entrance at the Astley Cheetham Art Gallery and create a new accessible entry.

Interior updates planned

Trinity Street building also received structural repairs; improvements to lighting and the art gallery windows; and the creation of a central art display. These latest makeover plans would update the interior, as the décor has become old and tired, according to planning documents.

Planning papers read: “The library contains a number of important original features which make a positive contribution to the character and significance of the listed building.

“Over time, however, the quality of the space has been weakened by clutter, tired finishes and later decorative changes which do not fully reflect the architectural value of the space. The proposed works seek to address practical issues within the library while restoring a clearer sense of dignity, order and quality.

“The intention is not to over-modernise the room, but to carefully reveal and enhance the qualities already present.”