London borough expands flood defences amid El Niño fears
London borough expands flood defences amid El Niño fears

An east London council has expanded its flood defences across the borough in a bid to safeguard homes from the growing threat posed by extreme weather.

New stretches of Hydrorock, which functions as a kind of underground sponge, have been rolled out as part of a wider £11million plan.

Installation sites and technology

It has been installed in High Road in Seven Kings, Claybury Broadway in Clayhall, and Tomswood Hill in Barkingside after all three sites were identified as potential flood risks due to previous episodes of flooding.

Hydrorock, developed in the Netherlands, absorbs rainwater during heavy downpours, storing it temporarily before releasing it slowly into the sewer network. The technology prevents the sewers becoming overwhelmed by these sudden surges, which can lead to roads becoming flooded.

Additional measures and capacity

In addition to the underground works, sections of road were also resurfaced with permeable paving to further help absorb rainwater off the road and into the underground Hydrorock blocks.

The flood risk reduction schemes installed this year can temporarily hold around 426,000 litres of storm water, and 2.2million litres across the entire borough’s entire defence network.

Background and climate concerns

Councillor Jo Blackman, the cabinet member for environment, said the town hall is “strengthening our flood defences, reducing local flood risk and helping build resilience” as “extreme weather becomes more common”.

It follows the installation of six rain gardens in Clayhall, Woodford and Hainault earlier this year. The move comes amid growing concern over the impact of climate change on London’s weather following a summer of record-breaking heatwaves.

Scientists and forecasters are also warning that an El Niño on a scale never seen before will make extreme weather more likely over Britain this winter.