A48 Carmarthenshire safety scheme: key changes proposed
A48 Carmarthenshire safety scheme: key changes proposed

One of Carmarthenshire’s busiest roads faces a series of alterations to improve safety and traffic flow. Under plans being consulted on for the A48 between Cross Hands and Pensarn, Carmarthen, short sections of central reservation would be blocked off, right turns at junctions would stop and U-turns at the same junctions would also be prohibited.

The scheme has been designed to reduce the likelihood of future collisions by addressing locations where cross-carriageway movements take place on a high-speed section of road. The A48 links the M4 with the A40, funnelling holiday-makers to West Wales and carrying a lot of heavy goods vehicles and local traffic.

What changes are proposed

The three sections of central reservation that could be blocked off are at junction 16 Llanarthne, junction 17 Foelgastell and junction 18 Maesybont. Right turns onto the A48 from a B road at junction 14 Llanddarog and another from a C road onto junction 15 Pant-y-ffynnon could be prohibited, while the right turn off the A48 at junction 14 Llanddarog would stop except for local buses.

Wide Pickt banner — collaborative shopping lists app for Telegram, phone mockup with grocery list

In addition, U-turns for eastbound traffic at Llanddarog would cease along with U-turns for westbound traffic at Pant-y-ffynnon. The measures also include closing six lay-bys in both directions deemed substandard.

Timeline and background

Work is currently expected to begin in the autumn or winter and take around four months, subject to the weather, with some temporary lane closures needed. A Welsh Government spokeswoman said the details of measures taken forward will be announced following the end of the current consultation on September 18.

“The solution will be aimed at reducing the risk of collisions, improving road user safety, and enhancing the long-term operation of this important transport corridor,” she said. A range of previous safety improvements have been implemented on the A48 including speed management measures and junction work. They followed a Welsh Government-commissioned transport study in 2020.

People can object to the changes currently being proposed by September 18 as part of a consultation run by Carmarthenshire Council on behalf of ministers.

Pickt after-article banner — collaborative shopping lists app with family illustration