Manchester Airport's Winter Snow-Clearing Operation Explained
Manchester Airport's Winter Snow-Clearing Operation

Manchester Airport operates a large-scale winter operation to keep its airfield safe, using a fleet of more than 30 snow-clearing vehicles and specialised de-icing equipment to manage over 20 miles of runways and taxiways.

Preparing for Snow and Ice

Each autumn, the airport's fleet and operating teams prepare for the winter ahead. Melanie Lawley, Head of Airfield Operations, oversees the airfield, including aircraft stands, apron, and runways, ensuring they can operate safely.

The airport relies on sophisticated weather forecast systems from StormGeo, which provide a specific forecast for Manchester Airport, allowing snow predictions three to four days in advance. Lawley explains that they also work with airlines to understand their flight plans.

De-Icing the Airfield

Unlike roads, the airfield cannot be treated with traditional grit and salt because it is corrosive to aircraft. Instead, a de-icing fluid is used, spread by two machines with spraying arms covering a 30-metre span. These de-icers can carry up to 12,500 litres of fluid. The runway surface is slightly grooved to improve grip.

For snow, tractors with mounted ploughs and nine Combined Jet Sweepers work in formation to clear runways, sweeping snow away from the centre. Lawley notes the challenge of coordinating this around aircraft movements, ideally with a 15-minute gap between operations.

Aircraft De-Icing

Aircraft are de-iced by each airline's contracted handling agents, such as Swissport and Menzies, using rigs with articulated booms. Some aircraft need one rig, but larger ones like the A380 may require four. Each rig is calibrated to dispense the correct type and amount of fluid as per airline procedures.

Occasionally, the airfield must be closed completely for clearing, which can cause delays but is necessary for safety. The snow fleet remains on alert until spring, as ice can still occur in March or April.